Base Career helps you apply smarter for this job.
Key skills for this role
Preparation of schedule (Primavera / MS project), detailed work plan (activities) based on the project objectives and contractual specifications.
Developing a schedule along with critical path for commissioning different phases along with cost loading in Primavera P6 18.8.
Preparation of L1 Schedule in Primavera, equipment requirement & equipment deployment schedule, time cycle, method statement and construction sequence for major activities of Marine Jetties, Berths, Breakwater, LNG Tanks, Harbors, Quay Wall, Material Handling, Industrial Structures and Green Energy Projects.
Time cycles, preparing and updating time location diagram for better understanding.
Preparing and submitting as-built drawings
Understanding the budget related activities such as work plan, direct cost, indirect cost, MIS (Management Information System) and cash flow summary.
Resource planning - compilation of resource requirement (manpower, material and equipment)
Analyzing rates obtained for resources.
Preparation of project progress Report in terms of adherence to timelines, turnover, profitability, and cash flow
Preparation of equipment performance report against norms
Preparation of material consumption report including allocation and wastage and assisting Quantity Survey (QS)
Identification of avenues for cost reduction.
Coordinating with construction department for daily activities and directing the construction activities towards milestone & subsystem completion with respect to commissioning.
Comparison of actual progress vs budgeted progress with the help of S-curve.
Skip the repetitive application forms
Install the Base Career Chrome Extension and autofill job applications across major job boards with your profile.
Trusted by over 500,000 job seekers on Base Career
More from this employer
Bang, IND
Afcons Infrastructure Limited is an Indian multinational construction and engineering company based in Mumbai. The company provides infrastructure services and is involved in the construction of infrastructure projects s
, IND
Afcons Infrastructure Limited is a part of Shapoorji Pallonji Group, one of the largest construction group in India. Over the last six decades, we have emerged as one of the leaders in EPC Infrastructure Industry by cont
Bang, IND
, IND
, IND
, IND
, IND
, IND
, IND
, IND
Time to time modifications of project plan, schedule, and budget in coordination with Planning In-Charge and Project Manager
Preparing delay analysis for different packages of overall project
Preparation of reconciliation related to structural steel, rebar, cement, and other consumables.
Maintaining the contractual documents (such as letter correspondences both incoming & outgoing).
Preparing & updating tender documents (appendix related to program)
Maintaining requisite data for project team performance measurement (and provide input as required)
Submission of Daily Progress Report (DPR) to Head Office after approval from Planning In-charge & Project Head
Submission of correspondences for technical reports as per the contractual requirement.
Recording and reporting actual progress of work, manpower & equipment versus the planned figures.
Recording the monthly site progress photos.
Recording actual data for productivity, resources & equipment for future references
Reporting to Planning In-Charge & Project Manager about site progress and critical issue with viable solutions.
Submission of Daily Progress Report (DPR), Monthly Progress Report (MPR), Monthly flash report, WIP (work in progress) report, Executive reports (Feedback to execution) to Head Office after approval from Planning In-charge & Project Manager.
Preparation of strip chart report to represent the status of all structure and activity for internal management as well as for client.
Providing supporting data for MIS.
To ensure achievement of project objectives on time, within budget and within contractual conditions by developing an overall project plan and schedule and monitoring against the same, identifying deviations and suggesting corrective measures.
AutoCAD, MSP, MS Excel, MS Word, Power Point Knowledge of Primavera / MS Project / BIM software is mandatory
Minimum 5 to 10 Years in planning activities for projects involving the construction of Marine Jetties, Berths, Breakwater, LNG Tanks, Harbors, Quay Wall, Material Handling, Industrial Structures and Green Energy Projects.
Mostly office Indoor job and occasional visits to sites. Required to work on computers for long hours and pay great attention to detail. Should be able to handle work pressure.
Flagship infrastructure engineering and construction company of the Shapoorji Pallonji Group.
Visit company websiteJobs and hiring trendsFull-time
Senior · 5+ years experience
Onsite
Apply faster on company sites with our extension.