More from this employer
Lockhart, USA
Job Summary MEP Manager will lead the effort in coordinating and managing the MEP trades on major construction projects. This candidate will work with the project team to ensure successful completion of all MEP trade wor
Iva, USA
Job Summary Assist skilled craft workers in performing their assigned duties. Work in other crafts at levels appropriate to training and skills as requested by project supervision. Must have the ability to take direction
Iva, USA
Job Summary Assist skilled craft workers in performing their assigned duties. Work in other crafts at levels appropriate to training and skills as requested by project supervision. Must have the ability to take direction
Iva, USA
Job Summary Provide leadership, management, and supervision necessary for receiving, identifying, marking, storage, processing and issuing materials work in accordance with all applicable plans, specifications, codes, an
Tempe, USA
Tempe, USA
Patagonia, USA
Reno, USA
Lockhart, USA
Iva, USA
Iva, USA
Iva, USA
Base Career helps you apply smarter for this job.
Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site.
This work will be performed under general supervision.
Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site.
This work will be performed under general supervision.
Assists with the document preparation for scanning (i.e., removes all staples, paper clips). 2.
Handles document retrieval requests, and assists in document reproduction. 3.
Maintains the master project/drawing / specification files as the repository of design /construction documents. 4.
Maintains transmittal logs and records and ensures compliance. 5.
Organize, prepare and box in-active records for archives, storage, retention and/or destruction. 6.
Responsible for maintenance of the project electronic and physical library records. 7.
Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library. 8.
Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.
3-5 years of previous support experience required.
with Contract Manager or other contract management tool is preferred. 2.
Familiarization with Prolog, ERP systems and other related project management software preferred. 3.
Must be detailed oriented, have excellent organizational skills and have the ability to multi-task. 4.
Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook. 5.
Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience). 6.
Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.
Note: Job Description is subject to change at any time and may include other duties as assigned.
May stoop, kneel, or bend, on an occasional basis 2.
Must be able to comply with all safety standards and procedures 3.
Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 4.
Will interact with people and technology frequently during a shift/work day 5.
Will lift, push or pull objects pounds on an occasional basis 6.
Will sit, stand or walk short distances for up to the entire duration of a shift/work day. 7.
Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors Safety Level
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
#LI-HW1
Employee-owned general contracting and construction services firm.
Visit company websiteJobs and hiring trendsSkip the repetitive application forms
Install the Base Career Chrome Extension and autofill job applications across major job boards with your profile.
Trusted by over 500,000 job seekers on Base Career